Contract No. : (22 year 2019 Baghdad Governorate)
Project Name: Demolition and reconstruction of an 18-class model AL EMAM AL- SAJAD secondary school in Al Shuala
, the third Karkh Education Directorate
Client: Baghdad Governorate
Location: Al Shuala District.
Amount: 1,778,553,000 ID
Award Date: 13/1/2020
Duration of the contract: 210 Days
Type of the contract: direct contract between Baghdad Governorate & Noor Al Meshkat co.
About the Project: The project is the demolition and reconstruction of a typical 18-class model AL EMAM AL- SAJAD secondary school with a total area of 100 * 40 m in the Al Shuala area., the third Karkh Education Directorate
Contract No. : (22 year 2019 Baghdad Governorate)
Project Name: Demolition and reconstruction of an 18-class model AL EMAM AL- SAJAD secondary school in Al Shuala
, the third Karkh Education Directorate
Client: Baghdad Governorate
Location: Al Shuala District.
Amount: 1,778,553,000 ID
Award Date: 13/1/2020
Duration of the contract: 210 Days
Type of the contract: direct contract between Baghdad Governorate & Noor Al Meshkat co.
About the Project: The project is the demolition and reconstruction of a typical 18-class model AL EMAM AL- SAJAD secondary school with a total area of 100 * 40 m in the Al Shuala area., the third Karkh Education Directorate
Contract No. : (1/1/2022)
Project Name: Maintenance work on the ground floor (basement exudation) of the Department of Buildings complex
Client: Al-Farouk General Construction Contracting Company - Ministry of Housing, Construction, Municipalities and Public Works
Location:.Baghdad
Amount: 251.650.000 DI
Award Date: 31/11/2022
Type of the contract: direct contract between Al-Farouk General Construction Contracting Company & Noor Al Meshkat co.
Raising the floor layer (granite) with mortar for the entire area of the basement, which is (900 square meters Raising the concrete layer under the floors with a thickness of (10 cm) and an area of (1095 square meters Raising the space layer with a thickness of (40 cm) and a quantity of (450 cubic meters Then a trench was dug along the area of the inner perimeter of the basement walls, down to the building's basement (the eave), with dimensions of (1 m * 40 cm). This is to identify the areas of exudation and treat them. Exudation zones were determined in the walls after the observation period, which lasted (15) days. Injection equipment and materials and a team specialized in these works were equipped. Where the walls were injected with (1320 BASF) along the wall with (90) injection points After completing the injection section, there was a second observation period for a period of (30) days to ensure that there was no other perfusion in the walls. After that, the work of treating the areas of the right drains and the areas of entry of the sewage pipes into the wall was started according to Article (590 BASF). After that, the walls and the trench were cleaned of any sediment and dirt, and then the entire wall was painted with waterproof (polyflex) concrete paint Extending the pipes of the water drainage network on the entire perimeter of the wall with a length of (275 meters) and connecting them to a submersible system that works automatically according to the water levels Carrying out the work of leveling the un-raised space layer and preparing space for the burial works of the raised layers from the trench and the basement space Carrying out the work of spreading a layer of thick agricultural nylon, preparing the necessary concrete materials and equipment for pouring the basement floor, and proceeding with pouring the basement floor with a thickness of (10 cm)
Project name: - Construction of Al- Mashkhab Bridge and its approaches in Al-Najaf Al-Ashraf Governorate
Client: - Al-Najaf Governorate (Reconstruction Authority)
Supervising Authority: - Najaf Reconstruction Authority and the Department of Roads and Bridges in Najaf Governorate
Contract amount: (2,644,899,500) two billion six hundred and forty-two million eight hundred and ninety-nine thousand five hundred dinars
Date of assignment: 4/9/2023
Contract duration: (225) days
Contract Type: Direct Invitation
Brief summary of the project:
The project includes the implementation of a concrete bridge in Al-Mashkhab district (on the Euphrates River) with a length of 96m and consists of four spans (the length of each space is 24m) including concrete piles (28m deep) and 1.5m in diameter and concrete columns (1.2m in diameter and 5m high) and girders with a length 24m
(Pre-cast and Pre-Tension), pouring the bridge deck and making a protective fence. As well as executing bridge approaches with a length of (480m) 340m from the right side and 140m from the left side, including earthworks ( filling and cutting), subbace and asphalt works