Past Performance
- Contract Number: W5K9ZM-10-R-0010
- Project Name: Border Road –Section III- Al Qaim / Al waleed
- Client: USA Corp of Engineers (USACE) for MOI
- Location: Anbar, western Iraq
- Amount: $ 16,500,000
- Starting Date: 26-8-2010
- Completion Date: 1-5-2011
- Type of Contract: J.V. with Al Raheeq Al Makhtoom Company project Description: Execution of 30KM from a border road in the western region of Iraq the width of road was 10m with shoulders 6m paving road with three layers of Asphalt also to the work was include Design & constructing 13 Concrete tubular Culverts.
- Contract Number: W917BK-10-C-004
- Project Name: Border Road- Al Qaim/Tarfawi
- Client: USA Corp of Engineers (USACE) for MOI
- Location: Al-Qaim, Anbar, Iraq
- Amount: $ 52.500 000
- Starting Date: 12-12-2009
- Completion Date: 1-4-2010
- Type of Contract: J.V. with Khairi Hamim Company For construction.
- Project Description: execution of 90 KM from a border road in the western region of Iraq the width of road was 10m with shoulders 6m paving road with three layers of Asphalt also to the work was include constructing 40 Concrete box Culverts.
- Contract Number: Direct invitation
- Name of Project: Elementary school 12 Classrooms
- Client: Baghdad Governorate
- Location: Baghda/ Al Hamediah City
- Amount: 828,535,000 Iraqi dinars
- Starting Date: 25-11-2008
- Completion Date: 25-1-2009
- Type of Contract: Main Contractor (Direct Contracting)
- About the project: Design & Construction Elementary school of 12 classrooms by K-Span System include Laboratories, game hall, walk ways, restrooms, gardens with all theelectrical and sewages works.
- Contract No.: Private Sector
- Project Name: Construction of 5-storey hotel with basement
- Client: Privet Sector
- Location: Baghdad - Kadhimiya
- Amount: $ 679,250
- Starting Date: 10-1-2010
- Completion Date: 31-3-2011
- Type of Contract: Main Contractor (Direct Contracting)
- About the project: Design & construction Hotel with 5-storey add to a basement at Al Kadhimiya City in Baghdad the total construction area of hotel about 1200 m2 with full services.
- Contract number: W5K9ZM-11-C-002
- Project Name: Al-Amij Camp
- Client: USA Corp of Engineers (USACE) to End user MOD
- Location: Anbar
- Amount: $ 3,754,980
- Starting Date: 12-11-2010
- Completion Date: 23-9-2012
- Type of Contract: J.V. with Al Khilal Company
- About the project: The contract includes the following works: (1) Rehabilitation and maintenance of the Qaser Amj Camp in Al Anbar governorate, 12 buildings from K-Span system, (2) Maintenance of the three camp generators with a capacity of 1250 KVA (3)
- Supplied & Install DFAC Equipments (4) Design and construction of new buildings for the camp, which include Armory building, clinic building and Ablution buildings with total number (6) from concrete structures. (5) Design and Construction DFAC storage area& Fuel Station by using K-Span System (6) Drilling water well with total depth 250 m also to installed water treatment (RO ) with capacity (12) m3 / h. (7) Design and construction of the project's infrastructure networks, including a water network with elevated tank from structures, Sewer network with Supply two sewage truck for sucking the sewage from septic tank and the electricity network with supplied two new generators for the project is equipped with a capacity of 250 KVA.
- Contract number: W5K9ZM-11-C-003
- Project Name: H3 Camp
- Client: USA Corp of Engineers (USACE) to End user MOD
- Location: Anbar
- Amount: $ 4,913,700
- Starting Date: 12-11-2010
- Completion Date: 9-1-2013
- Type of Contract: Main Contractor (Direct Contracting)
- About the project: The contract includes the following works: (1) Rehabilitation and maintenance of the H3 camp in Al Anbar governorate, 28 buildings with the K-Span system, (2) Maintenance of the fourth camp generators with a capacity of 1250 KVA (3) Supplied & Install DFAC Equipments (4) Design and construction of new buildings for the camp, which include Armory building, Clinic building, Bakery building, and Ablution building with total number (12) from concrete structures. (5) Design and Construction bleachers for (350) people from K-Span System & motor pool Shade (6) Drilling water well with total depth 250 m also to installed water treatment (RO ) with capacity (12) m3 / h. (7) Design and construction of the project's infrastructure networks, including a water network with elevated tank from structures, Sewer network with Supply two sewage truck for sucking the sewage from septic tank and the electricity network with supplied two new generators for the project is equipped with a capacity of 250 (KVA).
- Contract Number: W5K9ZM-11-C-004
- Project Name: Akashat Camp
- Client: USA Corp of Engineers (USACE) to End user MOD
- Location: Anbar
- Amount: $ 3,972,300
- Starting Date: 12-11-2010
- Completion Date: 18-10-2012
- Type of Contract: Main Contractor (Direct Contracting)
- About the project: The contract includes the following works: (1) Rehabilitation and maintenance of the Qser Amj Camp in Al Anbar governorate, 12 buildings from K-Span system, (2) Maintenance of the three camp generators with a capacity of 1250 KVA (3) Supplied & Install DFAC Equipments (4) Design and construction of new buildings for the camp, which include Armory building, Clinic building and Ablution buildings with total number (6) from concrete structures. (5) Design and Construction DFAC storage area& Fuel Station by using K-Span System (6) Drilling water well with total depth 750 m also to installed water treatment (RO ) with capacity (12) m3 / h. (7) Design and construction of the project's infrastructure networks, including a water network with elevated tank from structures, Sewer network with Supply two sewage truck for sucking the sewage from septic tank and the electricity network with supplied two new generators for the project is equipped with a capacity of 250 KVA.
- Contract Number: W5K9ZM-11-C-005
- Project Name: Nukhayb Camp
- Client: USA Corp of Engineers (USACE) to End user MOD
- Location: Anbar
- Amount: $ 5,546,580
- Starting Date: 12-11-2010
- Completion Date: 11-10-2012
- Type of Contract: J.V. with Al Khilal Company
- About the project: The contract includes the following works: (1) Rehabilitation and maintenance of the Nukhayb camp in Al Anbar governorate, 28 buildings with the K-Span system, (2) Maintenance of the fourth camp generators with a capacity of 1250 KVA (3) Supplied & Install DFAC Equipments (4) Design and construction of new buildings for the camp, which include Armory building, Clinic building, Bakery building, and Ablution building with total number (12) from concrete structures. (5) Design and Construction DFAC storage area from K-Span System & motor pool Shade (6) Drilling water well with total depth 250 m also to installed water treatment (RO ) with capacity (12) m3 / h. (7) Design and construction of the project's infrastructure networks, including a water network with elevated tank from structures, Sewer network with Supply two sewage truck for sucking the sewage from septic tank and the electricity network with supplied two new generators for the project is equipped with a capacity of 250 (KVA).
- Contract Number: LITL-AKAZ-CIVIL-GCW-WO-001 -004 & LITL-AKAZ-CIVIL-SEW-WO-002-004
- Project Name: Akkaz Electricity Power Station 2 × 125 MW
- Client: Lanco Company
- Location: Anbar
- Amount: $ 19,276,859
- Starting Date: 12-6-2012
- Completion Date: 12-6-2012
- Type of Contract: J.V. With Baider Al Arab for contracting Company
- About the project: The Work includes construction all civil work Station Buildings, concrete pads for equipments, piping work, External walls 4Km around the power Station.
- Contract number: SV-031-2013 & Additional contract with No. 2014-075-SV
- Project Name: Oil Police Camp (OPF CAMP)
- Client: Kogas Company
- Location: Anbar
- Amount: $ 2,898,233
- Type of Contract: Joint Venture with Al Khilal Company for Contracting.
- Starting Date: 12-8-2013
- Completion Date: 6-4-2014
- Project Description: Design & execution Camp the work include with dimension of project (100*80) m and consist of : (1) 20 caravans (3*12) m used as accommodation for oil police , offices , kitchen , dining , ablution , and weapon storage (2) 4 concrete bunker (3) radio tower (4) four guard tower (5) two generators with fuel tank 25000 L and 10000 L (6) water tank 10000 L (7) sewage tank 10000 tank (8) T-wall fence (9) walk way & road (10) water, sewage and electrical network.
- Contract number: W912ER-12-C-0012
- Project Name: Military Training Compound (MTC)
- Location: Baghdad-IZ
- Amount: $ 24,356,284.59
- Type Of contract: Joint venture with Bayad Al Sard Company
- Starting Date: 5-3-2012
- Completion Date: 9-3-2016
- About the Project: The work includes the construction of the military training Compound in Baghdad governorate - Harthiya area from steel structures, According to the designs and specifications prepared by the USA Company (Louis Pirger) the project include Seven buildings with a total area of 21,000 square meters and the details as follows (1) Construction DFAC Building a one-story building with a k-Span Roofing and supplied it will all DFAC Equipments (2) Construction Clinic building a one storey building with K-Span Roofing include X-ray room walls of it was insulated by lead Sheets also to supplied some of building's furniture (3) Construction two Housing building with two-story and concrete roofing (4) Construction two Offices buildings with two-story and K-Span roofing with supplied furniture for two buildings (5) Construction of networks and infrastructure for the project, which includes a water network with a main sectional water Tank total capacity 350,000 m 3, a sewer network with a lift station of 110 m 3, containing four submersibles Pumps , Storm water network with a 110 m3 lift station and four submersible Pumps, Electrical network with Supplied 3 kiosk, communication networks for the site, equipped with communications rooms in the each buildings and propane gas network (LPG) for the project to feed DFAC building and restaurant in each office building.
- Contract number: M / 2/4/32311
- Name of Project: Rehabilitation Building for General Secretariat of the Council of Ministers.
- Client: General Secretariat of the Council of Ministers
- Location: Baghdad-IZ
- Amount: 837,760,000 Iraqi dinars
- Type Of contract: Direct Contract
- Starting Date: 1-10-2014
- Completion Date: 1-12-2015
- About the Project: The work includes Rehabilitation all activities in buildings (Civil, Arch., Electrical, and Mechanical) & installation network of System Cameras& internet also to rehabilitation Garden Works with walk ways.
- Contract No.: Road and Base Rules CN-036-2013
- Project Name: Designing and construction of roads and wells pad.
- Location: Anbar
- Client: Kogas Company
- Amount: $ 10,969,889
- Type of Contract: Main Contractor (Direct Contracting)
- Starting Date: 1-11-2013
- Completion Date: 1-6-2014
- Project Description: Designing and construction interior road in Akkas Gas field with length 17 km width of road is 10m paving and 2.5 m as shoulder for each side of the road with marking line and traffic signs in additional the contract include four Concrete pads for gas wells.
- Contract No.: CN -052-2013
- Project Name: Designing and construction of the temporary camp for Kogas Company
- Location: Anbar
- Client: Kogas Company
- Amount: $ 2,068,984
- Type of Contract: Main Contractor (Direct Contracting)
- Starting Date: 14-9-2013
- Completion Date: 1-6-2014
- About the project: Design & execution Camp the work include with dimension of project (150*100) m and consist of : (1) 16 caravans (3*12) m used as accommodation for kogas staff and 34 caravan used as offices , kitchen , dining , ablution , and weapon storage (2) four concrete bunker (3) permanent guard tower with guards room (4) two generators with two fuel tank 25000 L (5) water tank 200000 L (6) sewage treatment 100000 L (7) T-wall , Hesco and ditch fence (8) walk way & road (9) water, sewage and electrical network (10) sunshade for 10 cars and two trucks.
- Contract number: SV-080-2014
- Project Name: Designing and construction of a warehouse
- Location: Anbar
- Client: Kogas Company
- Amount: $ 1,190,840
- Starting Date: 1-5-2014
- Completion Date: 1-6-2014
- Type of Contract: Main Contractor (Direct Contracting) Project Description: Designing and construction of a warehouse with Dimensions (9 x 100) m from Steel Structure and Concrete pad covering by Sandwich panel & Corrugated sheets in Akkaz Gas field in Al Anbar Governorate.
- Contract number: 2014-Akkas-001-1
- Project Name: Topographic & Geotechnical Survey for Gas Pipeline
- Client: STX Company
- Location: Anbar
- Amount: $ 2,118,529
- Contract Type: J.V. with Baider Al-Arab Company & Al Saraf Group.
- Starting Date: 1-4-2014
- Completion Date: 1-6-2014
- Project Description: Execution of the topographical works and surveys of the gas pipeline form Akkaz field to Al Anbar governorate the work include doing geotechnical tests has been executed by Al- Ahmed bureau.
- Project Name: Floating Pump Station Projects
- Client: Ministry of water Resources
- Location: Middle and southern Iraq
- Type of Contract: Cooperation with United Compny for Marine Industries & JV with Ibn Majid State Company.
- About the Projects : The total number of pumps is 93 pumps, including 67 diesel pumps and 26 electrical pumps the work detail as below:
- Name of Project: Models Works
- Client: Ministry of Water Resource
- Location: Baghda/ Al Hamediah City
- Amount: $100,000
- About the project: Design & worked Models by Our company's architects Engineers staff / consulting office associated with the company designed and worked Models for projects implemented for the Ministry of Water Resources:
- Model for the Design of Al Massad Dam in Al Anbar governorate-Al Rutibah district for General commission of Dams & reservoirs.
- Model for the Design of 20 models for the projects of pump stations for Ministry of Water Resource
- Project Name : Construct Awirij Warehouse
- Location : Baghdad – Hilla High way
- Amount : $440,000
- Starting Date: 1-4-2014
- Completion Date: 1-6-2014
- Type Of Contract: Main Contract
- About the Work : Design and construct warehouse from K-span total area 2500m2 with adminstation building with yards & External Wall.
- Client: Private Contract
- Location : Baghdad
- Amount: $2,130,000
- Starting Date: 1-4-2015
- Completion Date: 1-8-2015
- Type Of contract: JV with Dar Al Hayakel Company
- About the Work: Design and construct truss for Water purification factory from Steel Structure with Diminsions ( 130 x 41) m total high in middle 13m and at edges 9m without using Intermediate columns covering from out site by sandiwch panels with all finishing & lectrical Mecheincal works.
- Project Name: Rehabilitation of Thirmiston plant belong to our Company partners with al-abid Al-Araby co.
- Loaction: Al –Saqlawiya – Al-Anbar
- About the Work: Thirmistone mold and pieces in all sizes, and all the raw material are local except the Aluminum Capacity of the plant: 500m3 of Thirmistone daily
- Name of the project: Construction sun shade for Maintenance of fire-fighting trucks of aircraft
- Location: Baghdad - Martyr Mohammed Alaa Air Base (Baghdad International Airport)
- Contract No. (01 / IRAQ / ITURRI / 2016)
- Contract Type: Subcontractor form ITURRI Spanish Company
- Beneficiary: Directorate of Military Works
- Contract value: $ 120,000
- Date of completion: 6/12/2018
- Project Description: Construction sun shade for Maintenance of fire-fighting trucks of aircraft for the Martyr Mohammed Alaa airfield (Baghdad International Airport) According to the design prepared by ITURRI Spanish Company. On an area of 300 square meters with a height of 7 meters construction from steel structure sections for columns, Beams& pralines, roofed by sandwich panels and about the side walls of build by masonry brick with thick.36cm to height 2.4m and the rest covered by sandwich panels, the sun shade contains office room and bathroom & kitchen, In the floor slab make hole for maintenance of the trucks also the work includes the completion of all mechanical, electrical and plumbing works and install two electromechanical Roll Doors for the main entrance with dimensions 4 × 5 meters
- Contract number: Design & Build Contract W912ER-14-C-0013 for Phase Two
- Solicitation W912-ER-13-R-0050, Piers & Dredging, Umm Qasr, Iraq
- Project Name: Piers & Dredging, Umm Qasr, Iraq
- Client: USA Corps of Engineers to MOD
- Location: Umm Qaser/ Basrah
- Amount: $3,654,600
- Type of contract: J.V. with Al-Nafath Company& Al Basrah for Construction Company.
- Starting Date: 1-6-2016
- Date of competion : 23-12-2018
- About the Project: Piers & Dredging, Umm Qasr, The project is executing in JV with Al-Nafath Company, the work supervision by USA Corps of Engineers, The work include execution of the dredging works to three disposal box with total volume 659310 M3,Fuel Station shade toal area 2100 m2 with provision of nine fuel Tanks & two Water tank with capacity 100,000 Litter for each oneconnection with Pumps through pipes work to the pier also to electrical works.
- Contract No. : SIPD-1547
- Project Name: Provision of Commuting Bussing Services (Logistic Project)
- Client: Shell Petroleum Company
- Location: Majnoon oil Field / Basrah
- Amount: $2,952,648
- Type of contract: Main Contractor
- Starting Date: 1-12-2016
- Date of competion : 31-12-2018
- About the Project: Provision& Rental of buses with total quantity (24) bus for the transporting Shell Staff from Majnoon oil field to Basra province and Conversely four of these buss is Toyota type castor 24 Set & eighteen is Toyota type Hiace 14 set.
On Going Projects
- Contract number: 8 / 2012
- Project Name: Dam construction Massad
- Client: Ministry of water Resources
- Location: Anbar/ Al Rutibah district
- Amount: 11,428,485,000 ID
- Starting Date: 7-3-2012 –ongoing
- Type of contract: Main Contract & J.V. with Al-Karabla Company.
- About the Project: The work include execution of the remaining works of the Masad Dam, which is located on Al-Masad valley (a branch of Horan valley) about 20 km southwest of al-Rutbah, in the governorate of Al-Anbar, a dam of 800 meters and a height of 17.5 meters with a side waterway. (1020 m) and width (6 m).
- Contract No. : 7411in 6-10-2013
- Project Name: Supply & install 5 elevators
- Client: Ministry of Housing& Construction/State commission for Buildings
- Location : Baghdad – Al Andalus Square
- Amount: 960,000,000 ID
- Starting Date: 4-11-2013 ongoing
- Type of Contract: Main Contractor (Direct Contracting)
- About the Work: Supply ,install , operate and maintenance five elevators to State Commission for Buildings , KONE type , Finland origin , and send delegation five engineers from State Commission for Buildings and from Al-Farouq State Co. for construction contracts to KONE factory in Finland
- Project No. : 2012 / 11 S
- Project Name: Design &Construction Floating pier in Um Qasr
- Client : MOD/ Directorate of Military Works
- Location :Um Qasr / Basra
- Starting Date: 2016 ongoing
- Amount: 10,874,000 ID
- Type of Contract: J.V with United Compny for Marine Industries & Ibn Majid state Company
- About the Work : Design and construct floating pier in north of Um Qasr / Basra Including Supplying &driven piles for steel pipes Dim.(1) m alog with wall of concrete pier as Bumper with total length about 165 m and total Number (82) piles with length 18 m level of piles with level of concrete pier and fixing rubber finder length 6m on it from sea derction This protection buffer has been constructed to prevent small boats from sliding down the pier and also the work include fixing floating pantons nine with Dimensions ( 6 x 1.8)m, two with dimensions ( 15.6 x 6)m and six with dimensions ( 18 x 6)m after finished fixing all pantons the wood fixed on it and fixed steel mesh to use as walk ways for pedestrian and installed rubber finder around the pantons from the outside to avoid damage.
- Project Name: Sprinkler irrigation systems operating solar
- Client: Baghdad Municipality / Parks Department and afforestation
- Location: Baghdad - Al-Zawraa Park
- Type of Contract: JV with AL Iraq and the world-tech company
Contract No. : (22 year 2019 Baghdad Governorate)
Project Name: Demolition and reconstruction of an 18-class model AL EMAM AL- SAJAD secondary school in Al Shuala
, the third Karkh Education Directorate
Client: Baghdad Governorate
Location: Al Shuala District.
Amount: 1,778,553,000 ID
Award Date: 13/1/2020
Duration of the contract: 210 Days
Type of the contract: direct contract between Baghdad Governorate & Noor Al Meshkat co.
About the Project: The project is the demolition and reconstruction of a typical 18-class model AL EMAM AL- SAJAD secondary school with a total area of 100 * 40 m in the Al Shuala area., the third Karkh Education Directorate
Contract No. : (22 year 2019 Baghdad Governorate)
Project Name: Demolition and reconstruction of an 18-class model AL EMAM AL- SAJAD secondary school in Al Shuala
, the third Karkh Education Directorate
Client: Baghdad Governorate
Location: Al Shuala District.
Amount: 1,778,553,000 ID
Award Date: 13/1/2020
Duration of the contract: 210 Days
Type of the contract: direct contract between Baghdad Governorate & Noor Al Meshkat co.
About the Project: The project is the demolition and reconstruction of a typical 18-class model AL EMAM AL- SAJAD secondary school with a total area of 100 * 40 m in the Al Shuala area., the third Karkh Education Directorate
Contract No. : (1/1/2022)
Project Name: Maintenance work on the ground floor (basement exudation) of the Department of Buildings complex
Client: Al-Farouk General Construction Contracting Company - Ministry of Housing, Construction, Municipalities and Public Works
Location:.Baghdad
Amount: 251.650.000 DI
Award Date: 31/11/2022
Type of the contract: direct contract between Al-Farouk General Construction Contracting Company & Noor Al Meshkat co.
Raising the floor layer (granite) with mortar for the entire area of the basement, which is (900 square meters Raising the concrete layer under the floors with a thickness of (10 cm) and an area of (1095 square meters Raising the space layer with a thickness of (40 cm) and a quantity of (450 cubic meters Then a trench was dug along the area of the inner perimeter of the basement walls, down to the building's basement (the eave), with dimensions of (1 m * 40 cm). This is to identify the areas of exudation and treat them. Exudation zones were determined in the walls after the observation period, which lasted (15) days. Injection equipment and materials and a team specialized in these works were equipped. Where the walls were injected with (1320 BASF) along the wall with (90) injection points After completing the injection section, there was a second observation period for a period of (30) days to ensure that there was no other perfusion in the walls. After that, the work of treating the areas of the right drains and the areas of entry of the sewage pipes into the wall was started according to Article (590 BASF). After that, the walls and the trench were cleaned of any sediment and dirt, and then the entire wall was painted with waterproof (polyflex) concrete paint Extending the pipes of the water drainage network on the entire perimeter of the wall with a length of (275 meters) and connecting them to a submersible system that works automatically according to the water levels Carrying out the work of leveling the un-raised space layer and preparing space for the burial works of the raised layers from the trench and the basement space Carrying out the work of spreading a layer of thick agricultural nylon, preparing the necessary concrete materials and equipment for pouring the basement floor, and proceeding with pouring the basement floor with a thickness of (10 cm)
Project name: - Construction of Al- Mashkhab Bridge and its approaches in Al-Najaf Al-Ashraf Governorate
Client: - Al-Najaf Governorate (Reconstruction Authority)
Supervising Authority: - Najaf Reconstruction Authority and the Department of Roads and Bridges in Najaf Governorate
Contract amount: (2,644,899,500) two billion six hundred and forty-two million eight hundred and ninety-nine thousand five hundred dinars
Date of assignment: 4/9/2023
Contract duration: (225) days
Contract Type: Direct Invitation
Brief summary of the project:
The project includes the implementation of a concrete bridge in Al-Mashkhab district (on the Euphrates River) with a length of 96m and consists of four spans (the length of each space is 24m) including concrete piles (28m deep) and 1.5m in diameter and concrete columns (1.2m in diameter and 5m high) and girders with a length 24m
(Pre-cast and Pre-Tension), pouring the bridge deck and making a protective fence. As well as executing bridge approaches with a length of (480m) 340m from the right side and 140m from the left side, including earthworks ( filling and cutting), subbace and asphalt works